Techno Geosurvey Consultants Limited
Thursday, April 30, 2026

Technogeosurvey

 
  • Topographic Survey

    Topography is the study of a surface. Recording all the existing features of the area including the measurement of elevation and shape

    Read More
  • Survey Team

    Techno Geosurvey Consultants Ltd provide a full range of engineering surveys to suit any building or civil construction project. Our surveyors and management team have the experience, capability and technology to resolve even the most complex survey challenges

    Read More
  • Geodetic Survey

    Techno Geosurvey Consultants Ltd are fully equipped with the latest survey quality GPS instruments and post processing software and can carry out all aspect of GPS surveying.

    Read More
  • Site Survey Preparation

    Survey Control is a network of permanent reference points used for setting-out and/or mapping purposes. We provide site control in local or national grid to millimetre / sub-millimetre accuracies.

    Read More
  • Control Points

    As the name states, this points controlling the project accuracy. one or two known station can be obtained from the authorities and it known as benchmark. Usually the project will be far from the bench marks thus leads to shift the benchmark value to the project area

    Read More

 

 

 
Major Projects undertaken by Techno Geosurvey Consultants Limited:

Among the major projects undertaken by the company include the following (higher s/n is the most current):

     
  • Topographical survey for Construction Project (Cement Factory- 32 Acres) in Goma North Kivu, DRC Congo. - November 2020
  • Route survey for 886.38 kms- Water Pipe line Supply and Distribution Networks at Dar es Salaam for CDEIC & HAINAN JOINT VENTURE : - May 2020
  • Topographical Survey of 280km for Transmission line 400KV from Kigoma to Nyakanazi with SHAKER CONSULTANTS GROUP .(Joint Venture With Geomarks Surveyors Co.Ltd): - February 2020
  • Topographical Survey for 172 Kms Transmission line 220 KV from RUSUMO to SHANGO in Kigali, Rwanda with Sterling & Wilson Pvt Ltd : - December 2019
  • Route survey for a 400kV-power line Transmission approx. 300Kms (Defining Angle Points and its way Leave) from Iringa to Mbeya region for TANESCO East Coast Zone: - September 2019
  • Topographical Survey of 160km for Transmission line 220KV from Kinyerezi to Morogoro for SGR : - February 2019
  • Topographical Survey and Control Extension of ?entre for Nuclear Science and Technology (Power Plant) at Lusaka in the Republic of Zambia for Joint-stock company Specialized state design institution (-GSPI- JSC from Moscow Russia). - December 2018
  • Topographical survey for Construction Project (Vaccine Animals) of Hester Biosciences Africa Limited in Coast region (Kibaha) at NDC area. - September 2018
  • Road surveying 34km of TARURA kinondoni Municipality- Dar Es Salaam Establishment of both control points, Leveling and Topographical survey: : - August 2018
  • Topographical Survey of Bus Stands, Morogoro Municipal and Storm Water Drainage of about 10km: - June 2018
  • Road surveying Tabora-Kagongwa-Nzega road 180km for Tanroad. Establishment of both primary and secondary control points, Leveling and Topographical survey - May 2018
  • Route survey for a 33kV-power line Transmission approx. 1600Kms of LT & HT in Mbeya region for Stegs International Services REA Phase III.(Joint Venture With Geozone Ardhi Co.Ltd): - March 2018
  • Topographical survey for Construction Project of Hester Biosciences Africa Limited in Coast region (Kibaha) at NDC area. - August 2017
  • Route survey for a 33kV-power line Transmission approx. 600Kms of LT & HT in Mbeya region for Stegs International Services REA Phase II.(Joint Venture With Geozone Ardhi Co.Ltd): - May 2017
  • Topographical Survey for Construction of Chuno Market in Mtwara Municipality for UWP Consulting Ltd - April 2017
  • Route survey for 120kms- Water Pipe line Transmission at Zanzibar (Unguja) for NJS as consultants. - January 2017
  • Topographical survey for Solar Mini Grid Project at Nansio Island in Ukerewe - Mwanza region for REX ENERGY LIMITED. - September 2016
  • Topographical survey for Upgrading Power Stations-Unions of Comoros for Matrix Solutions Pvt. Ltd as Clients
  • Route survey for a 33kV-power line Transmission 34Kms in Arusha region for Octopus Engineering Co. Ltd. - August 2016
  • Route survey for a 33kV-power line Transmission 713Kms in Arusha region for Angelique International Company Ltd. - July 2016
  • Re-establishment of Primary and Secondary Control, Topographical Surveying from Uyole to Songwe (49Kms) in Mbeya Region for Tanroad. - June 2016
  • Route survey for a 33kV-power line Transmission 53Kms in Arusha and Dar es Salaam region for Gaiwaje Constructions Ltd. - April 2016
  • Data processing and plan drawings for a 33kV-power line Transmission 250Kms in Monduli and Karatu Districts-Arusha for Octopus Engineering Co. Ltd. - January 2016
  • Topographical survey for a 33kV-power line Transmission 457Kms in Ruvuma region (Lot A) for Isolax Ltd. -October 2015
  • Route survey for a 33kV-power line Transmission 115Kms in Sumbawanga and Katavi region for Lucky Exports Ltd. -May 2015

 

 

 

 

Contact Us

  • Plot No. 755, Block 47 Kijitonyama Mabatini,P.O. Box 90338,
  • Kinondoni District-Dar es Salaam
  • Phone: +255752087427, +255714643492
  • Email:info@technogeosurvey.co.tz

Find us in social

Get us in social network listed bellow

rss in skype google